Stage one complete

We are slowly getting through the jobs, we are definitely not getting through them as fast as we did in the past.

Two big jobs that we have paid others to do have been completed: new engines and new rigging. The rerigging was a big job as the mast had to be taken down in order to change the diamonds.

The other two big jobs are repainting the hull sides and renovating the coppercoat, both requiring a lot of arduous sanding that Robert is not enjoying.